Chapter 6
Structural BMPs

Select a chapter from the menu to view a brief summery and a link to download that specific chapter.

Volume/Peak Rate Reduction by Infiltration BMPs
6.4.1. Pervious pavement with infiltration bed
6.4.2. Infiltration Basin
6.4.3. Subsurface Infiltration bed
6.4.4. Infiltration trench
6.4.5. Rain Garden/bioretention
6.4.6. Dry well/seepage pit
6.4.7. Constructed filter
6.4.8. Vegetated swale
6.4. 9. Vegetated Filter strip
6.4.10. Infiltration berm & retentive grading
Volume Peak Rate Reduction BMPs
6.5.1 Vegetated Roof
6.5.2 Rooftop runoff--capture &reuse
Runoff Quality/Peak Rate BMPs
6.6.1Constructed wetland
6.6.2 Wet pond/retention basin
6.6.3 Dry extended detention basin
6.6.4 Water quality filters & hydrodynamic devices
Restoration BMPs
6.7.1 Riparian buffer restoration
6.7.2 Landscape restoration
6.7.3 Soil amendment and restoration
6.7.4 Floodplain restoration
Other BMPs and related Structural Measures
6.8.1 Level Spreader
6.8.2 Special detention areas